 |
 |
 |
| |
  |
|
| |
         |
|
| |
|
|
| |
Behind the Scenes: Technical Direction
Our Technical team is housed in a 23,236-square-foot building, located near Catholic
University in Northeast D.C. It contains set construction and painting areas,
plus space for the storage of materials and equipment. The facility also contains
5 offices and a break room. Our professional, experienced staff constructs
the sets for all of the Shakespeare Theatre Company’s main stage and ancillary
productions. This spacious workshop, recently graced with the addition of a
CNC Router, is equipped to handle construction in wood, metals, foam and plexi-glass.
After construction, sets are transferred to our equally large painting area
for back painting and texturing. The paint staff can create scenic drops of
20’ by 40’ or more, and
texture in any medium required by the designers.
Staff
Technical Director
Asst. Technical Director Shop Buyer Shop Foreman 5 Scenic Carpenters
|
Scenic Charge
Scenic Artist Overhires as Needed
Interns
|
|
|
|
|
| |
|
 |
|
 |